The Summit at Guildex – September 2015

The final push to Telford started last Wednesday when we packed TS up into several stillages and plastic boxes.  The 7.5T truck was collected on Thursday evening and was at CS2 just after 17:30. Just as a matter of interest we measured the length of the truck. It was 1 foot shorter than the one previously measured. Fortunately we can push against the sides of a real van and by 20:00 we had finished loading.

 

After an uneventful trip we arrived at Telford around 13:30 on Friday. We got our tickets and were marshalled into the hall. 15 minutes later the van was unloaded and on its way to be parked. With most of the team of ten members together by about 14:00, as planned, assembly then started. Four and a half hours later we had finished. The longest part was assembly and levelling of the track boards. We will have to find a quick method for doing this.

 

For the two days of the show the layout performed without a fault.  Operator error was the cause of most problems. One loco did fail as did a van having its end pulled off in public! Other than that it was compliments all the way. Most pleasing.

At the end of the show we were disassembled, packed up and loaded into the van in two and a half hours. Most of the crew then left for home leaving four members to stay overnight and bring TS back home the next day

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s