This is the first update in a while, not because nothing has been happening, but because no great leaps forward were made on any Wednesday in the last few months, just steady progress – perhaps because it was just too hot! Well, we did get some stuff done on Wednesday and reached that critical tipping point where a website update was needed.
We will be at Sedgerail 2018 at Burnham-on-Sea with South Junction (SJ) in just over a week. The lighting rig for SJ was therefore removed ready for packing the rest of SJ and stock into its stillages this coming Wednesday. Picture shows the removed lighting rig.
On the subject of lighting, GasWorks (GW) has had its lights changed. The incandescent lights and controls have been retired after at least 20 years of use and extreme heat generation not least in the main plug.
The new lights are programmable LEDs. The first slide shows the installation of the LEDs onto the original lighting rig. Once attached and connected up, Tim used his phone and showed some of the colours available – as seen in the next three slides. It seems that the green hue will be used when we simulate the aurora borealis. The final two slides show the effect of the red and blue hues with the super cool new lighting rig fitted on the layout. We just need to program several set colours into phone control to set various scenes on GW during exhibitions. We could even program in lightning effects which would also work well on The Summit – perhaps to be followed by rain effects?

The new Pecking Mill end baseboards of Evercreech New (EN) were joined up to enable dowels to be positioned. Discussions also took place as to transporting of the two large new baseboards – a caravan chassis was mooted. Hopefully the track-beds will be cut and ready for installation next Wednesday – but South Junction takes priority. We will need to take the front of The Summit (TS) down early in September to get EN attached to TS’s fiddle yard. Once that is done work on Heyno Junction can start again.
So lots of assistance needed in the next 2 weeks and lots of jobs to do! Please don’t be shy in coming forward to help.






catenary also ran extremely well on its own!
As planned after St Neots and prior to our visit to Aylesbury Rail-Ex only the fiddle yard for The Summit has been re-erected and the new Evercreech New (EN) boards were moved into their relative positions next to the EN old boards now on their new steel legs. From the pictures you can see the relative heights of the large boards to the EN station boards – this being to cater for the full height of the eleven arch Prestleigh Viaduct. The gaps between the fiddle yard and the new EN boards will be filled with plain 4ft base boards at each side though they could eventually represent Cannards Grave cutting at one end and the short cutting with the three arch stone bridge just before Evercreech Junction at the other.
This a model of the area around Prestleigh. The heights are exaggerated on the model. Knowing the area well there is much to commend the selected route of the S&D Bath extension in very difficult terrain! Once the current baseboard of Heyno Junction is completed we will concentrate our efforts on Evercreech New.





Ballasting continues on the diesel depot – Ratcliffe Road.
The new N gauge layout has legs and a name – Kingsdon Central (KC). Work continues on the baseboards. Levelling of the boards will begin next week.



AllanH has sent us some pictures of his 00 gauge layout ‘Kingsferry’ which uses the GWR terminus of Kingsbridge for inspiration. The layout is quite simply already stunning and further progress has been made since the photos were taken, including adding the goods shed. The stock is an interesting and carefully selected mix, some of it kit-built from eBay with mostly ready-to-run locos. More pictures and information on this cracking layout can be found 
A couple of weeks ago Holly Junction was rent asunder with the aid of a small and largely volunteer army. Considerable progress has since been made in bridging the resulting gaps. Allegedly it was mooted that the fiddle yard should be a lifting section for ease of access until the full implications of this proposal dawned on the potential victims. The plan now is that a trolley should be provided to speed entry and exit from the heaving centre of operations.