Boards 3, 4 & 5 have been removed from the front of the layout for sorting out the the ground signals and points. We were a little enthusiastic with the ballasting and need to free them up. The wiring will also be tidied up while we have the chance. It all works, it’ll just look better. Board 5 has been completed.

fettling20timeTwo looms will have additional wires added to them so that the status of the signals on the front of the layout can be seen on the Up and Down control panels by the operators. The operators should also be able to see the state of the front signals on the monitors by the Up and Down control panels.

Although we had set the positions of the cameras to cover the front of the layout, actually mounting one of them in the required position would be difficult. Following a re-arrangement of the end cameras to point towards the ends not towards the signal box, a committee of two decided that, after viewing the changes on the screens, the changes were successful. The cameras are also easier to mount in their new position.

strip20lightingTwo strings of LED lights were obtained, one white and the other warm white. At £7 each they are not expensive. They were mounted in a white piece of guttering. Once we had found a suitable power supply, each 5m length uses 4A at 12V, we were able to light up part of The Summit to a reasonable level. Warm white was used in the gutter and the next try will be with a strip of white and warm white. It was also decided that what ever support and light we use that it will be usable for all other layouts in CS2.

That’s all for now. See you all sometime.

Regards

Dave

Gas Works at Seaton – Oct 2014

gasworks20at20seatonThe Seaton Show has come and gone and a good time was had by the chaps who attended. We had taken the HRCA (Yeovil and District) Hornby Dublo 3 rail layout with us as well as Gasworks. Fortunately we had loaded both layouts the night before as the rain came down heavily in the morning. Unloading layouts in the rain is not a pleasant experience but 6 people make it quick and easy.

The show was dominated by railway related stands, 16 in all with one stand each of boats and dolls houses. New friends were made and we can expect some visits to CS2 from them. Both Gasworks and the HD layouts worked well as did John Meakin who was demonstrating locomotive building.

ymrg20and20hrca20members20at20seaton

The slick dismantling of both layouts at the end of the show and packing of the van saw us back at CS2 and unloaded by around 5pm. For a week or two we will have the HD layout as a visitor.

Regards

Dave